Introduction. The objective was to sample four sources of waste at an inoperative non-ferrous metal recycling plant and develop a preliminary economic analysis for on- and off-site treatment options.
Sampling and Economic Analysis. Wastes were sampled and evaluated to determine contamination present. Evangelista performed a waste treatment preliminary economic analysis of two innovative on-site and five traditional off-site waste treatment alternatives.
More Information. Tonolli Metal Site, Nesquahoning, PA, Waste Treatment Preliminary Economic Analysis.
R. Evangelista. Prepared for the U.S. Environmental Protection Agency.
PDF 1.3 MB